Customer
InzheStroy LLC

Project dates
14.04.2019 – 15.05.2019

OPERATIONS AND SCOPE
GU 22N Larssen pile sheet vibration driving

EQUIPMENT
SVR 24 VM and ICE 1423C vibro hammers
Galichanin 32 t truck crane
RDK-250 crane
We care about our professional reputation. Working for you since 2006
from 9.00 to 19.00
order@lrpn.ru
Pipe driving
Ø219-1320 mm and tubular piling
Price
Static-load Larssen sheet pile pressing
Installation of pit shoring systems and sheet pile belts
Installation of in-situ piles
Concrete pile driving
geological information
quantity of work
work conditions
length of piles
We work all year long throughout Russia even in confined conditions.
We select the equipment and sheet piles, taking into account geological conditions and the load specified in the project. We are always able to offer an alternative, more economical sheet piles from the European manufacturers.
We save your money and never charge extra. We are responsible for every ruble spent.
Full documentary support during execution of work. Construction foreman maintains all the logs; we provide all the required documents after completion of the work.
We help you with engineering and construction design supervision.
We always have sheet piles at our warehouse.
On request, we can organize work around the clock seven days a week. We can use up to 4 vibratory pile drivers simultaneously.
Proper planning of work, own material and technical base, experienced staff, and a 12-hour work day. We are motivated for a quick and quality work. There is no such quality at this price in the market.
Experienced staff, their qualification is confirmed by the necessary certificates. We will provide you with the copies of all the documents.
We carefully select and buy the best quality material and carefully monitor its condition, so it will not jam up in interlocks and create any unnecessary delays during the work.
We constantly and meticulously work on quality and improve with each new project. We work in tandem with customers and quickly solve all issues.
We can provide a reference from any of the previous projects of your choice.
Max load moment - 60.8 t/m
Max load capacity - 16 tons
Boom length - 9.7-21.7 m
Max hook height - 21.7 m
1/1
Customer
InzheStroy LLC
Project dates
14.04.2019 – 15.05.2019
OPERATIONS AND SCOPE
GU 22N Larssen pile sheet vibration driving
EQUIPMENT
SVR 24 VM and ICE 1423C vibro hammers
Galichanin 32 t truck crane
RDK-250 crane
CUSTOMER
Techstroy-Chernozemye LLC
Project dates
20.03.2019 – 28.03.2019
OPERATIONS AND SCOPE
VL605A 73,440 t Larssen sheet pile static load pressing
EQUIPMENT
Giken F3 SPU-S static load press
25 t truck crane
CUSTOMER
EVS LLC
Project dates
12.03.2019 – 16.03.2019
OPERATIONS AND SCOPE
L5 UM 43,730 t Larssen sheet pile static load pressing
EQUIPMENT
Giken F3 SPU-S static load press
32 t truck cranes
CUSTOMER
MSB LLC
Project dates
20.12.2018 – 28.01.2019
OPERATIONS AND SCOPE
Vibro driving and extraction of 14,75 t VL606A Larssen sheet piles. Assembly and removal of a gripper system girth.
EQUIPMENT
ICE 1423С vibro hammer
Locomo and Compact Track CT-2 35 t cranes
CUSTOMER
SoyuzTeploStroy LLC
Project dates
17.11.2018 – 28.12.2018
OPERATIONS AND SCOPE
Static load pressing of 294,6 t of ESZ 28-700 Larssen sheet piles
EQUIPMENT
Giken SP SCZ 675 and Giken SP ECO 700S static load presses
Galichanin 25 t truck crane
CUSTOMER
United Bridge Building Company LLC
Project dates
28.04.2018 – 07.08.2018
OPERATIONS AND SCOPE
L5 UM Larssen sheet pile static load pressing, pilot drilling. Sheet pile extraction. Materials delivery.
EQUIPMENT
Giken Silen Piler F3 static load press
Isuzu-driven Aichi drilling unit
Galichanin 32 t truck crane
CUSTOMER
Stroytek LLC
Project dates
09.06.2018 – 15.06.2018
OPERATIONS AND SCOPE
Vibration driving of 44 tons of AZ 13-770 44 sheet piles and LV22 rotation parts. Girth and breaking system assembly.
EQUIPMENT
Muller 16 HFV vibro hammer
Galichanin 32 t truck crane
CUSTOMER
Farma Group LLC
Project dates
30.11.2017 - 06.06.2018
OPERATIONS AND SCOPE
Material delivery. VL606A Larssen pile driving. Girth and breaking system assembly. Girth removal. Sheet pile extraction.
EQUIPMENT
Muller 16 HFV vibro hammer
Galichanin 32 t truck crane
Client
SU25 Mosasfaltostroy
Project dates
04.02.2016 - 03.08.2016
Works performed
Delivery of 1233 tons of L4, L5, Vl 606A sheet piles
Driving and extraction of 1233 tons of L4, L5, Vl 606A sheet piles (2 phases)
Vibratory and impact driving of 350 mm concrete piles
Equipment
Vibratory pile driver ICE 1423 CM, Muller 20 Crane 32 tons (Galichanin), 25 tons (Klintsy) wheel-mounted diesel hammer SPM -1.8
Client
ArktikGidroStroy
Project dates
9.06.2016-15.06.2016
Works performed
Installation of 120 tons of L4 and VL 606A sheet piles
Equipment
Vibratory pile driver ICE 1423 CM
Crane 32 tons (Galichanin)
Client
Spets Stroy
Project dates
10.08.2015 - 23.08.2015
Works performed
Delivery of 65 tons of 377*9 pipe, L=7 m
Drilling
Installation of 65 tons 377*9 pipe, L=7 m
Equipment
Auger truck AICHI D 501
Crane 16 tons
Client
SI-74
Project dates
21.10.2015 - 12.12.2015
Works performed
Extraction of 270 tons of L4, L5, VL606A sheet piles
Equipment
Vibratory pile drivers Muller 20 and OZKANLAR DT200T
Cranes 32 tons (Galichanin) and 55 tons (Liebherr)
Client
ArktikGidroStroy
Project dates
20.05.2016 - 23.05.2016
Works performed
Extraction of 82 tons of AU18 sheet piles
Equipment
Vibratory pile driver OZKANLAR OVS 24
Crane 32 tons (Galichanin)
Client
“Stroytransgrup” and “Trest Gidromontazh”
Project dates
10.04.2016 - till now
Works performed
Delivery of 592 tons of VL603Z sheet piles
Driving and extraction of this tonnage four times (2368 tons)
Equipment
Vibratory pile drivers ICE 1423CM and RTS23
Crane RDK25
Client
Stroyproekt
Project dates
11.05.2016-15.05.2016
Works performed
Delivery of 96 tons of VL606A sheet piles
Driving and extraction of sheet piles
Equipment
Vibratory pile driver ICE 1423CM
Crane 32 tons
Client
Firma Mebe CJSC
Project dates
19.02.2015 - 28.08.2015
Works performed
Delivery of 284 tons of PU 12/10, AU - 18, VL606A sheet piles
Delivery of 45 tons of beam and pipe for strutting system
Driving and extraction of sheet piles, installation of strutting system, ground excavation
Equipment
Vibratory pile drivers Muller 24 and ICE 18RF-ts
Cranes: 60 tons (Galichanin), 35 tons (Ivanovets)
Client
RZDStroy and Noviy Proekt LLC
Project dates
17.09.2015 - 19.12.2015
Works performed
Delivery of 320 tons of L-4,VL606A sheet piles
Driving of 320 tons of sheet piles (4 phases)
Leader drilling
Equipment
Vibratory pile drivers ICE 1423 CM, FOSTER 4200, MULLER 15
Cranes 32 tons (Galichanin), 55 tons Liebherr
Client
Transneft and ArtikGidroStroy
Project dates
25.05.2016 - 12.06.2016
Works performed
Driving and extraction of sheet piles
Equipment
Vibratory pile driver OZKANLAR OVS 24
Crane 32 tons (Galichanin)
Client
SK Stalstroy
Project dates
14.03.2016-21.03.2016
Works performed
Delivery of 132 tons of VL606A, VL604n sheet piles
Driving of sheet piles
Equipment
Vibratory pile driver Movax 80
Client
ArktikGidroStroi
Project dates
26.06.2016 - 29.06.2016
Works performed
Extraction of 82 tons of VL606A sheet piles
Equipment
Vibratory pile driver ICE 1423 CM
Your personal data will not be transferred to the third parties. It will not be used for e-mail newsletters.
Pre-augering (Ø 300 mm), sheet piles l=12m,
Moscow, Losinoostrovskaya, 31.
Auger truck AICHI D501
Extraction of Vl606a sheet piles, L=6 m, power pylon, Yaroslavl district, Ivanovskiy perevoz, Ozkanlar OVS-24, Galichanin 32 tons
Installation of AU-18 sheet piles, L=12 m, Moscow region, Dmitrov district, roadway strengthening, Muller HSV-20, Galichanin 25 tons
Installation of AU-20 sheet piles, L=12 m, bridge construction, Saint-Petersburg, Novolisino, ICE 1423-c, RDK25
Installation of VL603-k, L=7 m, construction of bridge pillars, Leningrad region, Voyskorovo village, Junntan 25, RDK 25
Installation of Vl606a sheet piles, L=10m, M11 highway bridge pillar construction, Leningrad region, Yam-Izhora village, ICE 1423-c, Ivanovets 36 tons
Installation of L4 sheet piles, L=8m, slope strengthening, Moscow 8th Sokolinoy Gory street, 28, ICE 1423-c, Galichanin 32 tons
Installation of L5um sheet piles, L=6m, railway strengthening, Moscow, 8th Sokolinoy Gory street, 28, ICE 1423-c, Galichanin 32 tons
Installation of Vl606-a sheet piles, L=12m, construction of local sewage plant at the military plant, Ulyanovsk Moskovskoe shosse, 54, ICE 1423-c, Galichanin 32 tons
Step 1
You leave your inquiry
on our website or by phone.
Step 2
Our specialist
specifies your needs.
Step 3
You approve commercial
offer
Step 4
You point at the necessary contract alterations and pay advance.
Step 5
We start working on
your project.
Step 6
We guarantee quality of our work.
197022, Saint Petersburg, 6A Aptekarsky Prospekt, office 4-N
Е-mail: order@lrpn.ru
Tel. multichannel for all questions:
+7 (917) 577-17-47
Moscow, Reutov, Lenin street, d.1a of. 418
Е-mail: order@lrpn.ru
Tel: +7 (812) 627-16-49